Sign In | Join Free | My burrillandco.com |
|
Ask Lasest Price | |
Brand Name : | ZW |
Model Number : | forged ball,grinding media ball |
Certification : | ISO9001:2008 |
Price : | Negotiable |
Supply Ability : | Annual output 80000 tons |
Delivery Time : | 3 days after order confirmation |
Grinding steel balls are a main tool for grinding materials, usually used in ball mills. Grinding steel balls produce abrasive effects through collision and friction with materials, thereby achieving the grinding effect of materials
Forged Ball Details:
Material | Chemical Elements | |||||
C | Si | Mn | P/S | Cr | Hardness (HRC) | |
45# | 0.42-0.50 | 0.17-0.37 | 0.5-0.8 | <0.035 | <0.25 | 60-65 |
60MN | 0.55-0.65 | 0.17-0.37 | 0.7-1.0 | <0.04 | <0.25 | 58-63 |
B2 | 0.72-0.85 | 0.17-0.37 | 0.7-1.0 | <0.04 | 0.4-0.6 | 55-58 |
B3 | 0.58-0.66 | 1.3-1.9 | 0.65-0.8 | <0.025 | 0.7-0.9 | 56-65 |
B6 | 0.97-1.03 | 0.2-0.3 | 1.0-1.1 | <0.025 | 0.5-0.6 | 61-65 |
Material | 25mm-50mm HRC | 60mm-90mm HRC | 100mm-125mm HRC | 130-150mm HRC | ||||
Surface | Core | Surface | Core | Surface | Core | Surface | Core | |
C45 | 55-58 | 55-58 | 50-68 | 23-30 | 48-52 | 22-26 | 48-52 | 22-25 |
60Mn | 58-62 | 55-60 | 58-62 | 30-36 | 57-61 | 26-32 | 57-61 | 26-30 |
B2 | 60-64 | 58-64 | 57-64 | 45-60 | 55-60 | 38-48 | 55-60 | 38-42 |
B3 | 62-65 | 60-65 | 60-65 | 58-65 | 56-65 | 50-62 | 56-63 | 50-55 |
B6 | 62-65 | 60-65 | 61-65 | 58-65 | 60-63 | 50-62 | 61-63 | 50-55 |
Casting Ball
1) Traditional Forged
Raw material →Cutting →Heating → Water quenching → Tempering
2) Auto Hot Rolling
Raw material →Hot Rolling Mill → Water Quenching → Tempering
3) Casting
Raw material preparation →Smelting→ Pouring→Cooling and demoulding→Heat treatment and inspection
Q1. Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Q2. Do you have any MOQ limit for the order?
A: 1ton MOQ.
Q3. How to proceed an order ?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our
suggestions.
Thirdly customer confirms the samples and places deposit for formal
order.
Fourthly We arrange the production.
![]() |